The Music City Mall Parking Lot Expansion
We got the call from the site superintendent on a Tuesday afternoon. A weekend storm had blown over three of our standard units at the Music City Mall construction site, leaving the crew without facilities and the project manager furious about the downtime. The mud was ankle-deep around the tipped units, and we had a 4-hour window before the concrete pour crew arrived the next morning.
Our crew rolled out with two trucks before dawn. We righted the units, performed an emergency pump-out on the spot, and anchored all six toilets with heavy-duty stakes into the wet clay. We finished just as the concrete trucks were lining up. The superintendent told us he didn't lose a single worker hour because of the bathroom situation.
You guys saved our schedule when that storm hit.
Mike, Site Superintendent